San Diego County Water Authority

Contracting Opportunities


 


The San Diego County Water Authority solicits competitive proposals and bids for a variety of goods, supplies, materials and services. To be included on the Water Authority's bid list, please register at the following site: www.sdcwa.org/register.html

To view the Water Authority’s Purchase Order Terms and Conditions, click here.

All qualified firms wanting to do business with the Water Authority, including small businesses, are encouraged to obtain information on the upcoming projects listed below.

Design Manual: Volume One (Design Contractor Guide) - practices and standards that are used for design of projects at the San Diego County Water Authority

Design Manual: Volume Two - Facility Design Guide

General Conditions and Standard Specifications (2005 Edition)

Note: To print this web page, please set your page orientation to landscape.

CONSTRUCTION

Project

Estimated Value/Advertisement Date/Contacts

Other Project Information

Trades

Mission Trails Pipeline Tunnel and Vent Demolition

The project consists of a 92-inch diameter, 5,000-foot pipeline tunnel from north of Elliot Vent Number 1 to south of Elliot Vent Number 4, and appurtenant facilities for the untreated water system. The Mission Trails Pipeline Tunnel will relieve hydraulic constraints along the Second Aqueduct located North of Mission Gorge and will result in eliminating up to ten Elliot Vents through Mission Trails Regional Park.

Estimated Value
$ 35,000,000.00 - $ 41,500,000.00

Estimated Advertisement Date:
04-28-2008
Bid Opening/Proposal Due Date:
07-29-2008

Contacts
Mike Conner
Contract Manager
mconner@sdcwa.org
Ph (858) 522-6856
Fax (858) 522-6568

Melissa Retener
Contract Technician
mretener@sdcwa.org
Ph (858) 522-6804
Fax (858) 522-6568

Project Fact Sheet


Contract Documents Order Form


Plan Holders List

Questions and Answers

Links to Electronics Contract Documents:

The Network          Ebidboard

Anticipated Trades
General Contractors; General Engineering; Landscape; Structural Contractors; Welders

Other Trade
Tunnel Construction
East County Regional Treated Water Improvements Program - Otay Flow Control Facility

The project will expand the capacity of the existing Otay 14 Flow Control Facility from 8 mgd to 16 mgd. The facility is comprised of a partially below grade structure with inlet and outlet piping. The address of the facility is 290 South. Third Street, El Cajon, CA 92019. This expansion will require upsizing about 75’ of 16” piping to 20”. Several mechanical equipment/appurtenances will require replacement including isolation, control, and air valves, venturi flowmeter, valve electric actuator, and minor instrumentation. The existing facility will be subject to civil, mechanical and electrical work. Minor structural modifications to the building will also be required. Construction is expected to commence in October 2008 and be completed by August 2009.

Estimated Value
$ 420,000.00


Estimated Advertisement Date:
08-00-2008
Bid Opening/Proposal Due Date:
--

Contacts
Assem Salam
Ph (858)522-6842
Fax (858)268-7802

Project Fact Sheet


Project Documents Order Form


Plan Holders List

Questions and Answers

Links to Electronics Contract Documents:

The Network          Ebidboard

Anticipated Trades
Electrical; General Engineering; Mechanical; Welders

Mission Trails Flow Regulatory Structure II

The project consists of a 12 million gallon buried concrete tank and appurtenant facilities for the untreated water system. There will be two 6MG basins with a hopper type bottom. A small building will provide access, ventilation and instrumentation.

Estimated Value
$ 28,500,000.00 - $ 33,500,000.00

Estimated Advertisement Date:
08-00-2008
Bid Opening/Proposal Due Date:
--

Contacts
Mike Conner
Contract Manager
mconner@sdcwa.org
Ph (858)522-6856
Fax (858)268-7802

Project Fact Sheet


Project Documents Order Form


Plan Holders List

Questions and Answers

Links to Electronics Contract Documents:

The Network          Ebidboard

Anticipated Trades
Electrical; General Contractors; General Engineering; Landscape; Mechanical; Structural Contractors; Welders

Emergency Storage Projects – Access Roads, and Marina Grading for San Vicente Dam Raise (Package 2)

Drill, blast, and excavate hard rocks to prepare for construction of marina access roads; construct permanent access roads of approximately 3/4 miles in length and 25 feet in width with asphalt pavement; and process about 250,000 cubic yards of rock/soil mix for mass grading for the upcoming marina facilities construction.

Estimated Value
$ 20,000,000.00 - $ 30,000,000.00

Estimated Advertisement Date:
10-00-2008
Bid Opening/Proposal Due Date:
--

Contacts
Jim Zhou
Design Manager
jzhou@sdcwa.org
Ph (858) 522-6837
Fax (858) 268-7802

Project Fact Sheet


Project Documents Order Form


Plan Holders List

Questions and Answers

Links to Electronics Contract Documents:

The Network          Ebidboard

Anticipated Trades


Other Trade
General Contractors, Surveying, drill/blasting/(rock) excavation, rock processing, A/C paving, earth
Emergency Storage Projects – Excavation, Access Roads, Dam Penetration and Piping for San Vicente Dam Raise Construction Package 2 (Specification No. 591)

Drill, blast and excavate about 175,000 cy of hard rocks to prepare for construction of marina access roads and dam foundation; construct permanent access roads of approximately 3/4 miles in length and 25 feet in width with asphalt pavement; and process about 200,000 cubic yards of rock/soil mix for mass grading; place fill materials for the upcoming marina; replace existing pipes; construct low-level outlet works requiring about 150-foot -long penetration through the existing dam; remove 3.5-foot high parapet wall, spillway guide walls, about 12-inches of concrete from the top of the dam; hydro-demolish about 2 to 3 inches of the downstream face of the existing dam, etc.

Estimated Value



Estimated Advertisement Date:
10-00-2008
Bid Opening/Proposal Due Date:
--

Contacts
Jim Zhou
Design Manager
jzhou@sdcwa.org
Ph (858) 522-6837
Fax (858) 268-7802

Project Fact Sheet


Project Documents Order Form


Plan Holders List

Questions and Answers

Links to Electronics Contract Documents:

The Network          Ebidboard

Anticipated Trades
Asphalt Concrete Workers; Cement Mason; Construction Inspector; Electrical; General Contractors; General Engineering; General Engineering Contractors; Graders; Gunite Worker; Laborers; Mechanical

Emergency Storage Projects – Roller-Compacted Concrete Dam and Appurtenant Facilities for San Vicente Dam Raise Construction Package 3 (Specification No. 592)

Raise the existing 220-foot dam by 117 feet; place approximately 600,000 cy of roller-compacted concrete; construct about 45-foot high saddle dam; build a new 200-foot tall outlet works tower with a new 300-foot long and 12-foot in diameter tunnel; multiple gates and fish screens; install large diameter pipes, valves and roller gates; install grout curtains in the foundation, consolidation grouting, and seepage prevention grouting for the saddle dam; install an upstream facing system; develop an on-site quarry and RCC mixing plant; mass fill for future marina; build marina facilities including boat ramps, parking lot, comfort stations, etc

Estimated Value



Estimated Advertisement Date:
10-00-2009
Bid Opening/Proposal Due Date:
--

Contacts
Jim Zhou
Design Manager
jzhou@sdcwa.org
Ph (858) 522-6837
Fax (858) 268-7802

Project Fact Sheet


Project Documents Order Form


Plan Holders List

Questions and Answers

Links to Electronics Contract Documents:

The Network          Ebidboard

Anticipated Trades
Asphalt Concrete Workers; Cement Mason; Construction Inspector; Electrical; General Contractors; General Engineering; General Engineering Contractors; Graders; Gunite Worker; Laborers; Mechanical

SERVICES: PROFESSIONAL and NON-PROFESSIONAL

Project

Estimated Value/Advertisement Date/Contacts

Other Project Information

Trades

Project Design Review and Environmental Compliance Monitoring Services for the Carryover Storage and San Vicente Dam Raise Project

Contractor will provide design review services during the final design phases of the project and environmental compliance monitoring support services during construction. Services will include monitoring of construction activities to ensure compliance with adopted project mitigation measures, design features, and permit requirements.

Estimated Value
$ 800,000.00 - $ 1,000,000.00

Estimated Advertisement Date:
02-15-2008
Bid Opening/Proposal Due Date:
03-17-2008

Contacts
Paul J. Amberg
Environmental Program Manager
Ph (858)522-6822
Fax (858)268-7881

Project Fact Sheet


Project Documents Order Form


Plan Holders List

Questions and Answers

Links to Electronics Contract Documents:

The Network          Ebidboard

Anticipated Trades


Other Trade
Environmental Compliance Monitors, Biological Resources Monitors, Cultural Resources Monitors, Noise
Design Review - As Needed Services

* The Water Authority may use its statement of qualifications database to shortlist for these opportunities.

Estimated Value
$ 850,000.00


Estimated Advertisement Date:
05-01-2008
Bid Opening/Proposal Due Date:
--

Contacts
Ilene
Story
istory@sdcwa.org
Ph 858-522-6829
Fax 858-268-7802

Project Fact Sheet


Project Documents Order Form


Plan Holders List

Questions and Answers

Links to Electronics Contract Documents:

The Network          Ebidboard

Anticipated Trades
Electrical; General Engineering; Mechanical; Structural Contractors

Other Trade
Civil, Architectual, Instrumentation and Controls, and Corrosion
Electrical Design and Instrumentation and Controls

As-Needed Services * The Water Authority may use its statement of qualifications database to shortlist for these opportunities.

Estimated Value
$ 500,000.00


Estimated Advertisement Date:
05-01-2008
Bid Opening/Proposal Due Date:
--

Contacts
Ilene
Story
istory@sdcwa.org
Ph 858-522-6829
Fax 858-268-7802

Project Fact Sheet


Project Documents Order Form


Plan Holders List

Questions and Answers

Links to Electronics Contract Documents:

The Network          Ebidboard

Anticipated Trades
Electrical

Other Trade
Instrumentation and Controls
Remote Monitoring for Cathodic Protection Facilities

The remote monitoring system for the Water Authority’s Impressed Current Cathodic Protection (ICCP) and Galvanic Anode Cathodic Protection (GACP) facilities will allow a single person to monitor the cathodic protection on the Water Authority’s pipelines remotely by accessing a computer. This system shall have the following capabilities: 1. Continuously monitor the operation of the ICCP and GACP systems, allowing for immediate response to equipment failure and vandalism; 2. Cycle the ICCP and GACP systems to properly survey the level of corrosion protection on a pipeline B. Remote Monitoring System Requirements: The remote monitoring system (RMS) requirements include installation of specialized hardware, software, data transmission capabilities, and Internet website services. The RMS installations have different requirements for various locations.

Estimated Value
$ 300,000.00


Estimated Advertisement Date:
05-12-2008
Bid Opening/Proposal Due Date:
06-18-2008

Contacts
Aleicia Rangel
Office Assistant
arangel@sdcwa.org
Ph 760-233-3242
Fax 760-480-9867

Project Fact Sheet


Contract Documents Order Form


Plan Holders List

Questions and Answers

Links to Electronics Contract Documents:

The Network          Ebidboard

Anticipated Trades


Other Trade
Corrosion engineering
Mission Trails Regional Park Habitat Restoration Consulting Services

Contractor services will include preparation of conceptual landscape design plans, preparation of habitat restoration plans and performance specifications, implementation of landscape and restoration plans, and post-construction monitoring and maintenance. Project includes vernal pool restoration.

Estimated Value
$ 800,000.00 - $ 1,000,000.00

Estimated Advertisement Date:
06-03-2008
Bid Opening/Proposal Due Date:
07-14-2008

Contacts
Paul J. Amberg
Environmental Program Manager
Ph (858)522-6822
Fax (858)268-7881

Project Fact Sheet


Project Documents Order Form


Plan Holders List

Questions and Answers

Links to Electronics Contract Documents:

The Network          Ebidboard

Anticipated Trades
Landscape

Other Trade
Landscape Architect- Uplands, Wetlands, and Vernal Pools Habitat Restoration; Biological Resources M
SAFETY, DRUG TESTING, AND FIRST AID SERVICES FOR CONSTRUCTION PROJECTS

Successful Contractor will provide on-site safety, drug testing, and first aid services for large construction projects including the Lake Hodges Pump/Storage Project; the San Vicente Dam Raise, Pipeline, and Pumping Facility Projects; and the Mission Trails Flow Regulatory Structure and Tunnels Project.

Estimated Value



Estimated Advertisement Date:
07-17-2008
Bid Opening/Proposal Due Date:
08-15-2008

Contacts
Deborah Hack
Management Analyst- Purchasing
Ph (858)522-6657
Fax (858)522-6564

Project Fact Sheet


Project Documents Order Form


Plan Holders List

Questions and Answers

Links to Electronics Contract Documents:

The Network          Ebidboard

Anticipated Trades


Emergency Storage Projects - Pipeline 3 Interconnect - DM

Design Contractor – Prepare a design for a new ESP pump station on Pipeline 3 of approximately 11.4 cfs capacity.

Estimated Value
$ 135,000.00


Estimated Advertisement Date:
08-00-2008
Bid Opening/Proposal Due Date:
--

Contacts
Bill Wood
Project Manager
BWood@contractors.sdcwa.org
Ph (619)543-4307

Project Fact Sheet


Project Documents Order Form


Plan Holders List

Questions and Answers

Links to Electronics Contract Documents:

The Network          Ebidboard

Anticipated Trades


Other Trade
Civil; Hydraulic; Mechanical; Electrical; Instrumentation and Controls
Pipeline 3 Relining Scripps Ranch to SR-52 CM

Construction Manager for Relining of approcimately 24,000 linear fet of 69-inch prestressed concrete cylinder pipe with steel liners inserted in up to 16 access portals

Estimated Value
- $ 3,000,000.00

Estimated Advertisement Date:
08-00-2008
Bid Opening/Proposal Due Date:
--

Contacts
Jennifer Farrell
Contract Technician
Jfarrell@contractors.sdcwa.org
Ph (619)725-5075

Project Fact Sheet


Project Documents Order Form


Plan Holders List

Questions and Answers

Links to Electronics Contract Documents:

The Network          Ebidboard

Anticipated Trades
Carpenter; Construction Inspector; General Contractors

Relining Project Miramar Hill to Scripps Ranch

Design services needed

Estimated Value
$ 350,000.00


Estimated Advertisement Date:
08-00-2008
Bid Opening/Proposal Due Date:
--

Contacts
Jennifer Farrell
Jfarrell@contractors.sdcwa.org
Ph (619)725-5075
Fax (619)725-5079

Project Fact Sheet


Project Documents Order Form


Plan Holders List

Questions and Answers

Links to Electronics Contract Documents:

The Network          Ebidboard

Anticipated Trades


Emergency Operations Center-Design

Review and edit 60 percent design as necessary, continue the architectural design and construction support services for an Emergency Controls Center. The Emergency Controls Center will be approximately 6,500 square feet and will house the relocated Aqueduct Control Room, Emergency Operations Center and associated staff offices. This facility will be designed as an "Essential Facility".

Estimated Value



Estimated Advertisement Date:
09-00-2008
Bid Opening/Proposal Due Date:
--

Contacts
Assem Salam
Project Manager
asalam@contractors.sdcwa.org
Ph (858)522-6842
Fax (858)268-7802

Project Fact Sheet


Project Documents Order Form


Plan Holders List

Questions and Answers

Links to Electronics Contract Documents:

The Network          Ebidboard

Anticipated Trades


ESP- Operations Center Building upgrade

Review and edit 60 percent design as necessary, and continue the design and construction support services for the upgrade of the Escondido Operations Center and the the seismic upgrade of a vehicle maintenance warehouse, both are located at 610 West 5th Avenue, Escondido, CA 92025. The vechicle maintenance warehouse is an 11,250 square foot warehouse that will be seismically upgraded to an "Essential Service Facility"

Estimated Value



Estimated Advertisement Date:
09-00-2008
Bid Opening/Proposal Due Date:
--

Contacts
Assem Salam
Project Manager
asalam@contractors.sdcwa.org
Ph (858)522-6842
Fax (858)268-7802

Project Fact Sheet


Project Documents Order Form


Plan Holders List

Questions and Answers

Links to Electronics Contract Documents:

The Network          Ebidboard

Anticipated Trades


Miramar Pump Station Rehabilitation

Design Contractor- Prepare design for rehabilitation of the existing Miramar Pump Station

Estimated Value
$ 110,000.00


Estimated Advertisement Date:
09-00-2008
Bid Opening/Proposal Due Date:
--

Contacts
Bill Wood
Project Manager
BWood@contractors.sdcwa.org
Ph (619)543-4307

Project Fact Sheet


Project Documents Order Form


Plan Holders List

Questions and Answers

Links to Electronics Contract Documents:

The Network          Ebidboard

Anticipated Trades
General Engineering

North County Flow Control Facilities

Construction Contractor- Construct three flow control facilities in the Fallbrook-Rainbow area of San Diego County

Estimated Value
$ 580,000.00


Estimated Advertisement Date:
12-00-2008
Bid Opening/Proposal Due Date:
--

Contacts
Bill Wood
Project Manager
BWood@contractors.sdcwa.org
Ph (619)543-4307

Project Fact Sheet


Project Documents Order Form


Plan Holders List

Questions and Answers

Links to Electronics Contract Documents:

The Network          Ebidboard

Anticipated Trades
General Engineering Contractors

Mechanical Design Pump Station/ Flow Control Facilities

As-Needed Services

Estimated Value
$ 400,000.00


Estimated Advertisement Date:
12-01-2008
Bid Opening/Proposal Due Date:
--

Contacts
Ilene
Story
istory@sdcwa.org
Ph 858-522-6829
Fax 858-268-7802

Project Fact Sheet


Project Documents Order Form


Plan Holders List

Questions and Answers

Links to Electronics Contract Documents:

The Network          Ebidboard

Anticipated Trades
General Engineering; Mechanical

Other Trade
Civil
Emergency Storage Projects - Pump Station at Pipeline 3 - DM

Design Contractor – Prepare a design for a short ESP interconnect pipeline between Pipeline 3 and Pipelines 1 and 2.

Estimated Value
$ 190,000.00


Estimated Advertisement Date:
8-00-2008
Bid Opening/Proposal Due Date:
--

Contacts
Bill Wood
Ph (619)543-4307

Project Fact Sheet


Project Documents Order Form


Plan Holders List

Questions and Answers

Links to Electronics Contract Documents:

The Network          Ebidboard

Anticipated Trades


Other Trade
Civil; Hydraulic; Mechanical; Electrical; Instrumentation and Controls
Emergency Storage Projects - Pump Station at Pipeline 4 - DM

Design Management ContractorDesign Contractor – Prepare a design for a new ESP pump station on Pipeline 4.

Estimated Value
$ 250,000.00


Estimated Advertisement Date:
8-00-2008
Bid Opening/Proposal Due Date:
--

Contacts
Bill Wood
Ph (619)543-4307

Project Fact Sheet


Project Documents Order Form


Plan Holders List

Questions and Answers

Links to Electronics Contract Documents:

The Network          Ebidboard

Anticipated Trades


Other Trade
Civil; Hydraulic; Mechanical; Electrical; Instrumentation and Controls
Emergency Storage Projects - Pipeline 3 Interconnect - CM

Construction Management Contractor.

Estimated Value
$ 185,000.00


Estimated Advertisement Date:
01-00-2009
Bid Opening/Proposal Due Date:
--

Contacts
Matt Smith
Ph (619)543-4305
Fax (858)268-7802

Project Fact Sheet


Project Documents Order Form


Plan Holders List

Questions and Answers

Links to Electronics Contract Documents:

The Network          Ebidboard

Anticipated Trades


Other Trade
Construction Management; Civil; Mechanical; Geotechnical
Emergency Storage Projects - Pump Station at Pipeline 3 - CM

Construction Management Contractor.

Estimated Value
$ 265,000.00


Estimated Advertisement Date:
01-00-2009
Bid Opening/Proposal Due Date:
--

Contacts
Matt Smith
Ph (619)543-4305
Fax (858)268-7802

Project Fact Sheet


Project Documents Order Form


Plan Holders List

Questions and Answers

Links to Electronics Contract Documents:

The Network          Ebidboard

Anticipated Trades


Other Trade
Construction Management; Civil; Mechanical; Geotechnical
Emergency Storage Projects - Pump Station at Pipeline 4 - CM

Construction Management Contractor

Estimated Value
$ 330,000.00


Estimated Advertisement Date:
01-00-2009
Bid Opening/Proposal Due Date:
--

Contacts
Matt Smith
Ph (619)543-4305
Fax (858) 269-7802

Project Fact Sheet


Project Documents Order Form


Plan Holders List

Questions and Answers

Links to Electronics Contract Documents:

The Network          Ebidboard

Anticipated Trades


Other Trade
Construction Management, Civil, Mechanical, Geotechnical
Print (Note: To print this web page, please set your page orientation to landscape.)
In addition, on an ongoing basis, the Water Authority purchases numerous commodities required for the operation of its facilities in both San Diego and Escondido, California. These may include the following: Various printing requirements, furniture and engineering supplies.

If you have any questions, please contact Deborah Hack, Management Analyst, at (858) 522-6657.