Project
|
Estimated Value/Advertisement Date/Contacts
|
Other Project Information
|
Trades
|
| Emergency Storage Projects – Roller-Compacted Concrete Dam and Appurtenant Facilities for San Vicente Dam Raise Construction Package 3 (Specification No. 592) Bids will be accepted from the following pre-qualified prime contractors: Ames - Granite A Joint Venture; Barnard-ASI Joint Venture; Dragoados USA, Inc./CC Meyers, Inc. Joint Venture; Kiewit Pacific Co.; and Shimmick Construction Company, Inc./Obayashi Corporation Joint Venture.
Raise the existing 220-foot dam by 117 feet; place approximately 600,000 cy of roller-compacted concrete; construct about 45-foot high saddle dam; build a new 200-foot tall outlet works tower with a new 300-foot long and 12-foot in diameter tunnel; multiple gates and fish screens; install large diameter pipes, valves and roller gates; install grout curtains in the foundation, consolidation grouting, and seepage prevention grouting for the saddle dam; install an upstream facing system; develop an on-site quarry and RCC mixing plant; mass fill for future marina; build marina facilities including boat ramps, parking lot, comfort stations, etc
|
Estimated Value $ 170,000,000 - $ 190,000,000
Estimated Advertisement Date: 01-28-2010 Bid Opening/Proposal Due Date: 03-17-2010
Contacts Nicola Kavanagh
Design Manager
nkavanagh@sdcwa.org
Ph (858)522-6846
Fax (858)268-7802
Melissa Retener
Contract Administrator
mretener@sdcwa.org
Ph (858)522-6804
Fax (858)268-7802
|
Project Fact Sheet
Contract Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades Asphalt Concrete Workers; Cement Mason; Construction Inspector; Electrical; General Contractors; General Engineering; General Engineering Contractors; Graders; Gunite Worker; Laborers; Mechanical
|
| Miramar Pump Station Meter Project The project consists of a 48-inch diameter, venturi flowmeter installation and associated concrete vault with power, lighting, ventilation, access control, security, and instrumentation. The project will provide metering capabilities for flows from the Miramar Pump Station.
|
Estimated Value $ 850,000
Estimated Advertisement Date: 04-00-2010 Bid Opening/Proposal Due Date: --
Contacts Miguel Valenzuela
Design Manager
mvalenzuela@sdcwa.org
Ph (858) 522-6832
Fax (858)268-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades General Contractors; General Engineering; Landscape; Structural Contractors; Welders
|
| Esc. HVAC Upgrade Install new HVAC system in the Escondido Office.
|
Estimated Value $ 250,000
Estimated Advertisement Date: 04-01-2010 Bid Opening/Proposal Due Date: --
Contacts Rachael Loring
Maintenance Supervisor
rloring@sdcwa.org
Ph (760)233-3231
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades Construction Inspector
Other Trade HVAC Installation and Maintenance. No subs.
|
| North County Flow Control Facilities (M0201) Construction Contractor- Construct flow control facilities in the Fallbrook-Rainbow area of San Diego County
|
Estimated Value $ 1,480,000
Estimated Advertisement Date: 07-00-2010 Bid Opening/Proposal Due Date: --
Contacts Mike Wallace
Design Manager
mwallace@sdcwa.org
Ph (858) 522-6866
Fax (858) 268-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades General Engineering Contractors
|
| North County Flow Control Facilities (M0221) Construction Contractor- Construct flow control facilities in the Fallbrook-Rainbow area of San Diego County
|
Estimated Value $ 1,200,000
Estimated Advertisement Date: 07-00-2010 Bid Opening/Proposal Due Date: --
Contacts Mike Wallace
Design Manager
mwallace@sdcwa.org
Ph (858) 522-6866
Fax (858) 268-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades General Engineering Contractors
|
| Relining Pipelines 3 and 4 Miramar Hill to Scripps Ranch This project will include the rehabilitation of approximately 17,300 feet of existing Pre-stressed Concrete Cylinder Pipe (PCCP) along the existing Pipeline 3 (8350 Feet) and Pipeline 4 (8950 Feet) from Miramar Hill to Miramar Water Treatment Plant in Scripps Ranch.
|
Estimated Value $ 21,500,000 - $ 24,750,000
Estimated Advertisement Date: 02-00-2011 Bid Opening/Proposal Due Date: --
Contacts Martin Coghill
Project Manager
mcoghill @contractors.sdcwa.org
Ph (619) 301-7836
Fax (858) 268-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades Boilermaker; Carpenter; Cement Mason; Construction Inspector; Fencing; General Engineering Contractors; Landscape; Soil and Material tester
|
| Mission Trails Flow Regulatory Structure II The project consists of a 12 million gallon buried concrete tank and appurtenant facilities for the untreated water system. There will be two 6MG basins with a hopper type bottom. A small building will provide access, ventilation and instrumentation.
|
Estimated Value $ 28,000,000 - $ 33,000,000
Estimated Advertisement Date: 04-00-2011 Bid Opening/Proposal Due Date: --
Contacts Mike Conner
Contract Manager
mconner@sdcwa.org
Ph (858)522-6856
Fax (858)268-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades Electrical; General Contractors; General Engineering; Landscape; Mechanical; Structural Contractors; Welders
|
| Construction of Emergency Storage Projects – San Vicente Reservoir Bypass Pipeline (Specification No. 593) Replace the existing City of San Diego San Vicente Reservoir Bypass Pipeline between the First Aqueduct to the proposed limits of the San Vicente Dam Raise.
|
Estimated Value $ 15,000,000 - $ 20,000,000
Estimated Advertisement Date: 05-00-2012 Bid Opening/Proposal Due Date: --
Contacts Mike Conner
Design Manager
mconner@sdcwa.org
Ph (858)522-6856
Fax (858)522-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades General Contractors; General Engineering Contractors; Welders
|
SERVICES: PROFESSIONAL and NON-PROFESSIONAL
|
|
|
|
Project
|
Estimated Value/Advertisement Date/Contacts
|
Other Project Information
|
Trades
|
| Acoustic Fiber Optic Cable for Pipelines P3, P4, P5 and Crossover Acoustic fiber optic cable monitoring for pipelines for P3, P4, P5 and Crossover. Sole Source.
|
Estimated Value $ 1,443,000
Estimated Advertisement Date: 03/01/2011-- Bid Opening/Proposal Due Date: --
Contacts George Smith
Sr. Engineering Technician
gsmith@sdcwa.org
Ph (760) 233-3246
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade Acoustic Fiber Optic Monitoring. No Subs.
|
| Smart Landscape Program Landscape Assistance Program Administration
|
Estimated Value $ 2,500,000
Estimated Advertisement Date: 12-00-10 Bid Opening/Proposal Due Date: --
Contacts Mayda Portillo
mportillo@sdcwa.org
Ph (858) 522-6762
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade Voucher and incentive administration
|
| WaterSmart Brand WaterSmart Brand Marketing Consultant
|
Estimated Value $ 500,000
Estimated Advertisement Date: 02-00-2010 Bid Opening/Proposal Due Date: --
Contacts Kelly Mooney
kmooney@sdcwa.org
Ph (858) 522-6766
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade Marketing, Research & Design
|
| RFP for Evaluation of Water Conservation Programs ----Currently open for Solicitation----
The San Diego County Water Authority is seeking proposals from qualified firms for as-needed impact and process evaluations of its water conservation programs. The Water Authority will award multiple contracts for these services, of varying amounts, which collectively will not exceed $525,000, contingent on approval of the Water Authority's next two-year budget for fiscal years 2012 through 2013. Contract(s) awarded shall be for a three-year period. At the discretion of the Water Authority, these contracts may be extended for two additional years.
|
Estimated Value $ 525,000
Estimated Advertisement Date: 02-01-2010 Bid Opening/Proposal Due Date: 02-23-2010
Contacts Mayda Portillo
Sr. Water Resource Specialist
mportillo@sdcwa.org
Ph (858) 522-6762
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade Accounting, Finance, or Economist consulting services
|
| Expert Landscape Professional Services (may be multiple contracts) Field Inspection Services, Standards Development, Professional Certification, Landscape Architecture, and Irrigation Design
|
Estimated Value $ 500,000
Estimated Advertisement Date: 03-00-2010 Bid Opening/Proposal Due Date: --
Contacts Carlos Michelon
Principal Water Resource Specialist
cmichelon@sdcwa.org
Ph (858) 522-6756
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade Landscape Inspection, Landscape Architect, Irrigation Systems Expert
|
| Web-Driven Water Budget Program Enhancements, hosting, and site maintenance
|
Estimated Value $ 300,000
Estimated Advertisement Date: 03-00-2010 Bid Opening/Proposal Due Date: --
Contacts Mayda Portillo
Sr. Water Resources Specialist
mportillo@sdcwa.org
Ph (858) 522-6762
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade website development, hosting, and maintenance
|
| Waste Disposal & Recycling Collection Twice weekly trash and recycling collection and disposal
|
Estimated Value $ 15,000
Estimated Advertisement Date: 04-00-2010 Bid Opening/Proposal Due Date: --
Contacts Gary Tannahill
Facilities Services Technician
gtannahill@sdcwa.org
Ph (858) 522-6922
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade Solid waste collection and disposal, recycling collection
|
| Janitorial Services Clean Administration Building office facilities
|
Estimated Value $ 150,000
Estimated Advertisement Date: 05-00-2010 Bid Opening/Proposal Due Date: --
Contacts Gary Tannahill
Facilities Services Technician
gtannahill@sdcwa.org
Ph (858) 522-6922
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade Janitorial services, janitorial supplies
|
| Demonstration Sites (may be multiple contracts) Multiple landscape site irrigation and plant design, installation, and maintenance.
|
Estimated Value $ 725,000
Estimated Advertisement Date: 06-00-2010 Bid Opening/Proposal Due Date: --
Contacts Kat Storms
Project Scheduler (LDE)
kstorms@sdcwa.org
Ph (858) 522-6760
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade Landscaper, Supervisory, Landscape Architect, Irrigations Systems Expert
|
| Mechanical Design Pump Station/ Flow Control Facilities As-Needed Services
|
Estimated Value $ 400,000
Estimated Advertisement Date: 06-00-2010 Bid Opening/Proposal Due Date: --
Contacts Nicola Kavanagh
Design Manager
nkavanagh@sdcwa.org
Ph 858-522-6846
Fax 858-268-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades General Engineering; Mechanical
Other Trade Civil
|
| Miramar Pump Station Rehabilitation Design Contractor- Prepare design for rehabilitation of the existing Miramar Pump Station
|
Estimated Value $ 225,000
Estimated Advertisement Date: 06-00-2010 Bid Opening/Proposal Due Date: --
Contacts Miguel Valenzuela
Design Manager
mvalenzuela@sdcwa.org
Ph (858)522-6832
Fax (858) 268-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades General Engineering
|
| Water Audits Commercial Water Audits
|
Estimated Value $ 100,000
Estimated Advertisement Date: 06-00-2010 Bid Opening/Proposal Due Date: --
Contacts Jeff Stephenson
jstephenson@sdcwa.org
Ph (858) 522-6750
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades Mechanical
Other Trade Mechanical Engineer
|
| Water Authority Pipeline Welding Services Welding Services
|
Estimated Value $ 50,000
Estimated Advertisement Date: 06-01-2010 Bid Opening/Proposal Due Date: --
Contacts Steve Carpenter
Systems Maintenance Supervisor
scarpenter@sdcwa.org
Ph (760) 233-3212
Fax (760) 480-9867
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade Boilermakers; Laboreres; Pipe Suppliers
|
| Landscape Maintenance Service Maintain Administration Building drought-tolerant landscape
|
Estimated Value $ 45,000
Estimated Advertisement Date: 10-00-2010 Bid Opening/Proposal Due Date: --
Contacts Gary Tannahill
Facilities Services Technician
gtannahill@sdcwa.org
Ph (858) 522-6922
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade Landscapers, landscape maintenance, drought-tolerant plants
|
| Coffee Services Provide and maintain coffee makers, coffee, and coffee supplies
|
Estimated Value $ 45,000
Estimated Advertisement Date: 03-00-2011 Bid Opening/Proposal Due Date: --
Contacts Gary Tannahill
Facilities Services Technician
gtannahill@sdcwa.org
Ph (858) 522-6922
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade Coffee services, coffee supplies
|
| Corrosion Engineer and Technician Services RFP Corrosion Engineer and Technician Services
|
Estimated Value $ 1,000,000
Estimated Advertisement Date: 04-01-2011 Bid Opening/Proposal Due Date: --
Contacts Eric Holm
Sr. Engineering Technician
eholm@sdcwa.org
Ph (858)522-6818
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades Boilermaker
Other Trade Corrosion Engineering Services. No Subs.
|
| Design of Emergency Storage Projects - Pipeline 3 Interconnect Design Contractor – Prepare a design for a short ESP interconnect pipeline between Pipeline 3 and Pipelines 1 and 2.
|
Estimated Value $ 835,000
Estimated Advertisement Date: 09-00-2011 Bid Opening/Proposal Due Date: --
Contacts Mike Wallace
Design Manager
mwallace@sdcwa.org
Ph (858) 522-6872
Fax (858) 268-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade Civil; Hydraulic; Mechanical; Electrical; Instrumentation and Controls
|
| Design of Emergency Storage Projects - Pump Station at Pipeline 3 Design Contractor – Prepare a design for a new ESP pump station on Pipeline 3 of approximately 11.4 cfs capacity.
|
Estimated Value $ 1,311,000
Estimated Advertisement Date: 09-00-2011 Bid Opening/Proposal Due Date: --
Contacts Mike Wallace
Design Manager
mwallace@sdcwa.org
Ph (858) 522-6872
Fax (858) 268-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade Civil; Hydraulic; Mechanical; Electrical; Instrumentation and Controls
|
| Design of Emergency Storage Projects - Pump Station at Pipeline 4 Design Contractor– Prepare a design for a new ESP pump station on Pipeline 4.
|
Estimated Value $ 900,000
Estimated Advertisement Date: 09-00-2011 Bid Opening/Proposal Due Date: --
Contacts Mike Wallace
Design Manager
mwallace@sdcwa.org
Ph (858) 522-6872
Fax (858) 268-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade Civil; Hydraulic; Mechanical; Electrical; Instrumentation and Controls
|
| Relining Pipeline 4 SR52 to Lake Murray - CM Construction Manager for relining approximately 16,000 Linear feet of pre-stressed concrete cylinder pipe, with steel liners.
|
Estimated Value $ 2,000,000
Estimated Advertisement Date: 12-00-2011 Bid Opening/Proposal Due Date: --
Contacts Martin Coghill
Project Manager
mcoghill @contractors.sdcwa.org
Ph (619) 301-7836
Fax (858) 268-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
|
| Emergency Storage Projects - Pipeline 3 Interconnect - CM Construction Management Contractor.
|
Estimated Value $ 185,000
Estimated Advertisement Date: 02-00-2012 Bid Opening/Proposal Due Date: --
Contacts Karen Henry
Project Manager
khenry@sdcwa.org
Ph (858) 522-6818
Fax (858) 268-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade Construction Management; Civil; Mechanical; Geotechnical
|
| Emergency Storage Projects - Pump Station at Pipeline 3 - CM Construction Management Contractor.
|
Estimated Value $ 276,000
Estimated Advertisement Date: 02-00-2012 Bid Opening/Proposal Due Date: --
Contacts Karen Henry
Project Manager
khenry@sdcwa.org
Ph (858) 522-6818
Fax (858) 268-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade Construction Management; Civil; Mechanical; Geotechnical
|
| Emergency Storage Projects - Pump Station at Pipeline 4 - CM Construction Management Contractor
|
Estimated Value $ 405,000
Estimated Advertisement Date: 02-00-2012 Bid Opening/Proposal Due Date: --
Contacts Karen Henry
Project Manager
khenry@sdcwa.org
Ph (858) 522-6818
Fax (858) 268-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
Other Trade Construction Management, Civil, Mechanical, Geotechnical
|
| Relining Pipeline 3 Scipps Ranch to SR52 - CM Construction Manager for relining approximately 24,000 Linear feet of pre-stressed concrete cylinder pipe, with steel liners.
|
Estimated Value $ 2,500,000
Estimated Advertisement Date: 12-00-2012 Bid Opening/Proposal Due Date: --
Contacts Martin Coghill
Project Manager
mcoghill @contractors.sdcwa.org
Ph (619) 301-7836
Fax (858) 268-7802
|
Project Fact Sheet
Project Documents Order Form
Plan Holders List
Questions and Answers
Links to Electronics Contract Documents:
The Network Ebidboard
|
Anticipated Trades
|
|